Precautions for installation and removal of leaf spring shackle pin
Time of issue:
2021-09-15
The leaf spring shackle pin is one of the common parts on the car. When disassembling and assembling the leaf spring shackle pin, it is often damaged due to some wrong operations. The following are the precautions during the disassembly and assembly of the leaf spring shackle pin:
1. When removing the leaf spring shackle pin from the vehicle, first remove the leaf spring pin, then move the leaf spring assembly and axle out of the vehicle, and finally remove the leaf spring seat bolts for disassembly.
2. Use a special tool to remove the table spring, use a copper hammer or a copper rod. It is not allowed to hit the side and surface of the leaf spring with a hammer.
3. After the leaf spring shackle pin is disassembled, the steel sheet must not be broken. The way to check for a break is to tap and listen.
4. When wearing the leaf spring lock, align the semicircular groove on the lock with the specified bolt hole.
5. The specified pressure is on the rear leaf spring backing plate, and it must not be damaged during disassembly. This mark is used for marking of rear frame systems and rear axles. It cannot be missing, and a certain extension width is guaranteed.
6. When installing the leaf spring shackle pin, the gap between the spring pieces of the leaf spring should be greater than 1.2mm. Before tightening the core bolts, the Huazhong spring group should be pressed tightly, and then the core bolts should be tightened after each piece is tightened. Tightening force distances are 40 and 60N/m.
7. Before the leaf spring is installed, each piece of rust must be removed and coated with graphite grease.
8. When installing leaf springs, the number of front and rear leaf spring assemblies should be equal, the total thickness difference should not be greater than 5mm, and the camber angle difference should not be greater than 10mm
9. When installing the leaf spring, the lateral displacement of each piece of steel of the leaf spring shall not exceed 25mm
10. When installing, there should be a 0.5mm gap of 7-lmm between the steel clip of the leaf spring and both sides of the steel, and the gap between the steel clip bolt sleeve and the steel and the top surface should be 1-3mm. Steel clamping bolts should be threaded from inside to outside to prevent the bolt from jumping out and scratching the tire.
11. When installing the leaf spring shackle pin, the supporting bolts should be tightened evenly and staggeredly, and the tightening torque should be implemented according to the technical requirements after the wheelbase load inspection.
Relevant News
Fujian Guanwei Auto Parts Co., Ltd.
Tel:
Vicky:+86-13205079977
Andy:+86-13665971955
Lydia:+86-15859771855
Wilson +86-18759799777
Fax: +86-0595-22351955
E-mail: info@gw-autoparts.com
WhatsApp:
Lydia:+86-15859771855
Skype: live:vicky.xu_9
Website: http://www.gw-autoparts.com
Add: Jinxi Second Road, Jinhe Avenue, Binjiang Machinery Zone, Xiamei Town, Nanan, Quanzhou, Fujian, China
Copyright © 2022 Fujian Guanwei Auto Parts Co., Ltd.
